top of page

 engineering 

TS

Cooling System Upgrade 

Stage 3

Stage 2 + T.S. Engineering Bespoke Cooling System design. Separation of high and low temperature cooling systems. The separation of the two systems allows for a reduction of the charged intake air temperatures to 10 degrees (F) over ambient  This system will require two custom T.S.E. radiators to regulate the new clutch circuit. Fabrication of custom hard piped clutch cooling circuit with dedicated water pump. All cooling circuit lines are hand bent out of aluminum hard pipe to provide the utmost reliability to our system.

Please contact us for an appointment today 

Click Here

  • Instagram

© 2020 T.S. Engineering

bottom of page